Clearance Sheet R2006-002568*001

 Department IssuesSigned OffIntl

Please provide a detail for anchoring the exterior AC unit to the structure.

5/5/2008 JNP

Received a proposal from Universal to perform a L-Pile Analysis. Please provide a revised piling installation inspection proposal from universal that indicated the scope of work as follows. Total Number of Installed Piles, Total Length of Installed Piles, Piles installed in accordance with drawings and specifications, Exceptions to pile placements (as built), Description of installation equipment and procedure for installation, and Site conditions.

 



 

  

5/5/2008 JNP