SJC Home
Clearance Sheet R2006-001738*005

 Department IssuesSigned OffIntl

1. Please provide the anticipated finished floor elevation in the NGVD datum to demonstrate compliance with the current design flood elevation. (Originally on page 8.0 of plans)

4/30/2019 dking

2. DETAIL/MISSING WALL SECTION DETAIL:

- Please provide a complete 2-story wall section detail showing materials, including interior wall covering, insulation material, and exterior wall finish with details, (FBC-107).  Plans have several conflicting details. Please have all documents correlate, (roofing pitch & type, attic insulation, wall insulation, floor truss bearings, truss to bond beam connection, vertical rebar spacing, ......)

 

3. Please provide a complete foundation page showing all footers interior and exterior. (FBC-R107).

Note: Detail E/2.0 footing depth is the same as the required anchor bolt penetration detail A/3.0

 

 SHEET 2.0 (FBC-R107)

- Please clarify when on the lintel table is an A or B type designation used for the specific locations .

- Missing plans for spiral stairs and surrounding floor system framing details.

- Provide PSL bearing requirements/support for bedroom 3 wall bearing point.

 

SHEET 1.2/2.0(FBC-R107)

- Detail 'C' - Welding a Simpson HU-14 hanger is not part of the manufacturers recommended installation methods and is general strap category not a specific hanger callout required by the situation.

- Detail 'D' - Isn't specific enough to construct/missing information and references a 30" floor joist while the truss sheets show 24". Do we need a new set of floor truss drawings?

NOTE: Both details need to be re-evaluated due to lack of specifics and have incorrect information.

4/30/2019 dking

SHEET 3.0 (FBC-R107).

- Ledger attachment to wall with lag screws may not work with masonry walls. Please revise connection or wall plans.

- There appears to be a conflict at bedroom 4 wall to outside floor deck attachment. Floor truss plans show bearing on top of block wall that is continuous through to the roof. (floor trusses are 8 inches to long)

4/30/2019 dking

 SHEET 4.1 - Please specify the exact floor joist hanger to attach joist to masonry wall.

4/30/2019 dking

Please Provide a Second Floor Floor Framing Plan showing all ledgers, hangers, hold downs, attachment requirements, and supports that match Engineered Floor Trusses. (FBC-R107).

4/30/2019 dking

Please provide roof sheathing and attachment matching metal roofing requirement of 15/32" on the Florida Product Approval sheet.

 

PLANS General Notes: Your re-submittal should include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, should be marked as "old set" and should be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.