Clearance Sheet R2006-001738*004

 Department IssuesSigned OffIntl

1)The cover sheet indicates an R2 occupancy, this is incorrect. Please review and revise as appropriate.

7/26/2017 blaw

2)Please provide the anticipated finished floor elevation in the NGVD datum to demonstrate compliance with the current design flood elevation.

7/26/2017 blaw

3)The proposed section indicates a shingle roof however the product approval indicates a metal roof. Please have all documents correlate.

7/26/2017 blaw

4)The proposed wall section indicates a vented attic however the energy sheets indicated a unvented assembly. Please have all documents correlate.

7/26/2017 blaw

5)Please provide the current ES report for the spray foam and indicate if a ignition barrier is to be used on the foam.

7/26/2017 blaw

6)Several details indicate the use of a MTS-18 strap embedded in the lintel. This is not an accurate strap for lintel installations, please revise drawings to indicate a proper strap for this application.

7/26/2017 blaw

7)Please provide 2 truss layouts as no structural review can be performed without it.

7/26/2017 blaw

8)Please have designer of record clarify this as a level 3 alteration on the plans.

7/26/2017 blaw

9)The 2 x 8 ledger has a fastening detail of 16" or 24", please only provide the minimum required spacing.

7/26/2017 blaw

10)Please provide the decimal #'s in the product approval forms for the doors and windows.

7/26/2017 blaw

11)The garage door receptacle is to be gfci protected as per 3902.2 of the 2014 FBC- Residential.

7/26/2017 blaw

12)Sheet 6 indicates a 2/12 roof pitch however the roof truss package does not appear to support this. Please review and revise as necessary.

7/26/2017 blaw

13)Please provide a foundation page showing all footers interior and exterior.

7/26/2017 blaw

14)Please have the energy sheets signed by the owner/agent.

7/26/2017 blaw

15)Please provide a patio engineering detail (posts, beams, footers, strapping, ceiling, etc.)

7/26/2017 blaw

16)The window flashings details are for a wood frame building however this appears to be a masonry building, please review and revise as necessary.

7/26/2017 blaw

17)Please provide a lintel schedule for the masonry openings.

7/26/2017 blaw

18)Please provide information on the beams as per the truss engineering. Please review plans that were reviewed as I have highlighted certain area for the EOR to review.

 

19) Please address porch footers missing information and uprights to 8 x 8 columns and attachment to lintel (areas highlighted for your convenience).

 

20)Please review stairs at foyer to ensure compliance with 311.7 of the 2014 FBC-Residential as their appears to be a beam running over the stairs.