| | Department Issues | Signed Off | Intl |
|
|
1)The cover sheet indicates an R2 occupancy, this is incorrect. Please review and revise as appropriate.
|
9/11/2018
| dking |
|
|
2)Please provide the anticipated finished floor elevation in the NGVD datum to demonstrate compliance with the current design flood elevation.
|
| |
|
|
3)The proposed section indicates a shingle roof however the product approval indicates a metal roof. Please have all documents correlate.
|
| |
|
|
4)The proposed wall section indicates a vented attic however the energy sheets indicated a unvented assembly. Please have all documents correlate.
|
| |
|
|
5)Please provide the current ES report for the spray foam and indicate if a ignition barrier is to be used on the foam.
|
9/11/2018
| dking |
|
|
6)Several details indicate the use of a MTS-18 strap embedded in the lintel. This is not an accurate strap for lintel installations, please revise drawings to indicate a proper strap for this application.
|
| |
|
|
7)Please provide 2 truss layouts as no structural review can be performed without it.
|
9/11/2018
| dking |
|
|
8)Please have designer of record clarify this as a level 3 alteration on the plans.
|
| |
|
|
9)The 2 x 8 ledger has a fastening detail of 16" or 24", please only provide the minimum required spacing.
|
| |
|
|
10)Please provide the decimal #'s in the product approval forms for the doors and windows.
|
9/11/2018
| dking |
|
|
11)The garage door receptacle is to be gfci protected as per 3902.2 of the 2014 FBC- Residential.
|
9/11/2018
| dking |
|
|
12)Sheet 6 indicates a 2/12 roof pitch however the roof truss package does not appear to support this. Please review and revise as necessary.
|
| |
|
|
13)Please provide a foundation page showing all footers interior and exterior.
|
| |
|
|
14)Please have the energy sheets signed by the owner/agent.
|
| |
|
|
15)Please provide a patio engineering detail (posts, beams, footers, strapping, ceiling, etc.)
|
| |
|
|
16)The window flashings details are for a wood frame building however this appears to be a masonry building, please review and revise as necessary.
|
9/11/2018
| dking |
|
|
17)Please provide a lintel schedule for the masonry openings.
|
| |
|
|
18)This review is terminated at this point due to the missing information.
|
| |