1)The cover sheet indicates an R2 occupancy, this is incorrect. Please review and revise as appropriate.

9/11/2018 dking

2)Please provide the anticipated finished floor elevation in the NGVD datum to demonstrate compliance with the current design flood elevation.

 

3)The proposed section indicates a shingle roof however the product approval indicates a metal roof. Please have all documents correlate.

 

4)The proposed wall section indicates a vented attic however the energy sheets indicated a unvented assembly. Please have all documents correlate.

 

5)Please provide the current ES report for the spray foam and indicate if a ignition barrier is to be used on the foam.

9/11/2018 dking

6)Several details indicate the use of a MTS-18 strap embedded in the lintel. This is not an accurate strap for lintel installations, please revise drawings to indicate a proper strap for this application.

 

7)Please provide 2 truss layouts as no structural review can be performed without it.

9/11/2018 dking

8)Please have designer of record clarify this as a level 3 alteration on the plans.

 

9)The 2 x 8 ledger has a fastening detail of 16" or 24", please only provide the minimum required spacing.

 

10)Please provide the decimal #'s in the product approval forms for the doors and windows.

9/11/2018 dking

11)The garage door receptacle is to be gfci protected as per 3902.2 of the 2014 FBC- Residential.

9/11/2018 dking

12)Sheet 6 indicates a 2/12 roof pitch however the roof truss package does not appear to support this. Please review and revise as necessary.

 

13)Please provide a foundation page showing all footers interior and exterior.

 

14)Please have the energy sheets signed by the owner/agent.

 

15)Please provide a patio engineering detail (posts, beams, footers, strapping, ceiling, etc.)

 

16)The window flashings details are for a wood frame building however this appears to be a masonry building, please review and revise as necessary.

9/11/2018 dking

17)Please provide a lintel schedule for the masonry openings.

 

18)This review is terminated at this point due to the missing information.