Clearance Sheet R2006-001477

 Department IssuesSigned OffIntl

1.  Provide framing details for upper roof, including knee walls, bearing, uplift, and shear resistance.

 

2.  Engineering specifies "Partially Enclosed" vs. Truss Pages specifies "Enclosed".
    Verify design, by EOR or provide new Truss Pages.

Truss Pages must be signed off by Engineer of Record (EOR).

 

3.  Specify sheathing or bracing for lower truss top chords and upper and lower truss bottom chords.

 

4.  Specify continuous uplift connections for porch posts/beams.

 

5.  Specify bond beams for masonry walls (13'-1" Plt. Ht.)

 

6.  Specify siding installation, including furring strips, o.c. spacing, and nailing on wall section drawing.
    Verify State Product Approval Number.

 

7.  Metal roofing installation instructions require 5/8" roof sheathing.
    Verify State Product Approval Number.