| | Department Issues | Signed Off | Intl |
|
|
1 – Area calculations was not included with resubmit, please
furnish.
2 – Window design pressures as listed within the submitted
Product Approvals do not meet the stated pressures given by the
Engineer of Record (-36psf). Please re-specify and resubmit. The
product approval submittals must be in congruence with the plans.
3 – This project is located in an Exposure C zone and is within a
Wind Bourne Debris area. Therefore, the openings must be provided
with protection or furnish impact glass within the windows and
glass doors. Please specify and resubmit.
|
| |