SJC Home
Clearance Sheet R2005-004820

 Department IssuesSigned OffIntl
1. This project is engineered as Enclosed Structure, and is located in the Wind-Borne Debris Region. As such, plans must include provisions for protection of openings per 2004 FBC-Residential section R301.2.1.2 and 2004 FBC-Building section 1609.1.4.  
2. Floor truss and framing engineering for second floor structure is missing in the submittal.  
FYI - REVIEW OF PLANS SUSPENDED. ADDITIONAL ITEMS MAY BE REQUIRED, DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.