SJC Home
Clearance Sheet R2005-003694

 Department IssuesSigned OffIntl
1 - Changing the structure to 3-story requires the building to be Fire Protected. This can be achived 2 ways, Sprinklers or a designed system as outlined within the FBC. Both methods are acceptable, please select, design, and submit for plan review. 2 - The Florida Energy data sheets submitted are much larger than the heated-A/C space, please recalculate and resubmit. 3 - There are no further comments at this time.