SJC Home
Clearance Sheet R2005-002873

 Department IssuesSigned OffIntl
1 - Please redesign this project to the 2004 FBC (Residential). Include the Main Wind-Force Resisting System method to used. 2 - The project was designed by a registered Architect; therefore all drawings must be signed and sealed. If the structural drawings were designed by a registered Engineer they also must be signed and sealed. 3 – There are no other comments at this time.