SJC Home
Clearance Sheet R2004-005288

 Department IssuesSigned OffIntl
1. Bearing wall footings missing at garage stair.  
2. Review garage roof framing. PLEASE PROVIDE ALL CALCULATIONS. Address outward rafter thrust. Review spans. See FBC Sec. 2309.  
3. Verify Partially Enclosed and 20psf Top Chord Dead Load.  
4. Please provide all engineering calculations.  
Specify materials and attachment of structural closure required for wind-load pressures at ceilings of open porches if this is an Enclosed Structure. Reference FBC 1606.1.5.  
When replacing pages of a Permit Application Package with new revised pages, please put the new pages in their proper place in each set and attach the pages, marked up by Plans Examiner, for faster Plan Review.  
FYI-ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW  
FYI-AS PER ORDINANCE # 98-42 “ An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged.