| | Department Issues | Signed Off | Intl |
|
|
1. Bearing wall footings missing at garage stair.
|
| |
|
|
2. Review garage roof framing. PLEASE PROVIDE ALL CALCULATIONS.
Address outward rafter thrust.
Review spans.
See FBC Sec. 2309.
|
| |
|
|
3. Verify Partially Enclosed and 20psf Top Chord Dead Load.
|
| |
|
|
4. Please provide all engineering calculations.
|
| |
|
|
Specify materials and attachment of structural closure required for wind-load pressures at ceilings of open porches if this is an Enclosed Structure. Reference FBC 1606.1.5.
|
| |
|
|
When replacing pages of a Permit Application Package with new revised
pages, please put the new pages in their proper place in each set and
attach the pages, marked up by Plans Examiner, for faster Plan Review.
|
| |
|
|
FYI-ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION
AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW
|
| |
|
|
FYI-AS PER ORDINANCE # 98-42 “ An additional fee due and payable at
permitting shall be of $100 each for any second resubmission of plans.
Per FL. Statute 553.80(2)(b), on any third and subsequent
resubmissions that do not correct a code violation that is
specifically and continuously noted in each previous rejection,
a fee of four times the amount of the fee attributed to plan
review will be charged.
|
| |