| | Department Issues | Signed Off | Intl |
|
|
FBC 1606.1.7 requires that the following information is noted on the plans. 1.Wind speed,
2. Wind importance factor, 3. Wind exposure, 4. enclosed or partially enclosed, 5.
Components and cladding chart.
|
11/5/2004
| JNP |
|
|
Project is located in the 120 mph C exposure impact resistance zone. This location requires that the openings (windows and doors) require opening protection or that the structure be designed as partially enclosed. Please revise the plans accordingly.
|
11/5/2004
| JNP |