The 2 gable ends and dormer are shown as being supported by the 2nd floor structure. Please depict on the plan hold down connectors to provide a continuous load path from the roof to the foundation. Verify if the floor structure is capable of carrying the load of the roof.

5/15/08 Contractor made modifications to roof and architect initialled.

5/15/2008 RCW

Please specify the connectors or provide detail for the connection of the LVL 2nd floor beams to the 6x6 posts.

5/15/8 Depicted on plan.

5/15/2008 RCW