| | Department Issues | Signed Off | Intl |
|
|
1. This building is in exposure 'C'. Wind load schedule on drawings shows exposure 'B'. Change designation and adjust structural calculations as neccessary.
2. Roof truss details show that trusses are designed for exposure 'B'. Redesign for exposure 'C' and resubmit.
3. Provide components and cladding wind load schedule as required by FBC 1606.
4. Provide UL or other NRTL identifying numbers for 1 hour fire rated load bearing walls, floor/ceiling assemblies, and roof/ceiling assemblies as required for three story buildings.
5. Show wall and ceiling areas on form 600A.
|
6/24/2004
| BDS |