| | Department Issues | Signed Off | Intl |
|
|
1. R322.1.8Flood-resistant materials.
Building materials and installation methods used for flooring and interior and exterior walls and wall coverings below the elevation required in Section R322.2 or R322.3 shall be flood damage-resistant materials that conform to the provisions of FEMA TB-2.
|
11/12/2021
| jdacosta |
|
|
2. R322.1.6 Protection of mechanical, plumbing and electrical systems.
Electrical systems, equipment and components; heating, ventilating, air conditioning; plumbing appliances and plumbing fixtures; duct systems; and other service equipment shall be located at or above the elevation required in Section R322.2 or R322.3.
The Kitchenette, Bathroom and Ice Machine are not allowed below the FEMA Design Flood Elevation.
|
11/12/2021
| jdacosta |
|
|
3. Please provide the Florida Product Approval number for the Composite Asphalt Roof Shingles.
|
11/12/2021
| jdacosta |
|
|
4. Please submit the Testing Agency approval document for the Spray Foam Insulation being used.
|
11/12/2021
| jdacosta |
|
|
6. Please provide the required Window/Door exterior Flashing details.
|
11/12/2021
| jdacosta |
|
|
7. Please show hydrostatic vents in all areas below Design Flood Elevation. Provide the Testing Agency Product Approval number for flood vents.
|
11/12/2021
| jdacosta |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
11/12/2021
| jdacosta |
|
|
Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer.
|
11/12/2021
| jdacosta |