Clearance Sheet R2003-005451

 Department IssuesSigned OffIntl
Provide a revised component and clading chart designed for a partially enclosed design. 3/3/2004 JNP
Provide header uplift schedule. 3/3/2004 JNP
Indicate location of shearwalls and provide fastening schedule. 3/3/2004 JNP
Provide top plate to bottom plate uplift connection for exterior bearing wall. 3/3/2004 JNP
Provide a continous uplift connection from A1, A13, C4 and C1 to the foundation supplied by the engineer of record. 3/3/2004 JNP
Provide bottom cord truss material and fastening schedule for partially enclosed design. 3/3/2004 JNP