| | Department Issues | Signed Off | Intl |
|
|
Provide a revised component and clading chart designed for a partially enclosed design.
|
3/3/2004
| JNP |
|
|
Provide header uplift schedule.
|
3/3/2004
| JNP |
|
|
Indicate location of shearwalls and provide fastening schedule.
|
3/3/2004
| JNP |
|
|
Provide top plate to bottom plate uplift connection for exterior bearing wall.
|
3/3/2004
| JNP |
|
|
Provide a continous uplift connection from A1, A13, C4 and C1 to the foundation supplied by the engineer of record.
|
3/3/2004
| JNP |
|
|
Provide bottom cord truss material and fastening schedule for partially enclosed design.
|
3/3/2004
| JNP |