Clearance Sheet R2003-000892

 Department IssuesSigned OffIntl
Provide ceiling joist layout. 7/30/2003 JNP
Provide revised foundation drawing to match bearing of conventional roof framing. Item remains open 7/30/03: Item remains open 8/18/03: 8/21/2003 JNP
Provide continous uplift connection from beams A,B,C,and D to the foundation. 7/30/2003 JNP
Indicate location of the new interior bearing walls and provide revised uplift schedule. Item remains open 7/30/03: 8/19/2003 JNP