| | Department Issues | Signed Off | Intl |
|
|
Provide ceiling joist layout.
|
7/30/2003
| JNP |
|
|
Provide revised foundation drawing to match bearing of conventional roof framing. Item remains open 7/30/03: Item remains open 8/18/03:
|
8/21/2003
| JNP |
|
|
Provide continous uplift connection from beams A,B,C,and D to the foundation.
|
7/30/2003
| JNP |
|
|
Indicate location of the new interior bearing walls and provide revised uplift schedule. Item remains open 7/30/03:
|
8/19/2003
| JNP |