| | Department Issues | Signed Off | Intl |
|
|
Indicate on plan all ends zones for component and cladding.
|
5/14/2003
| JNP |
|
|
Indicate on the plans the square footage for the conditioned space, garage, screened porch, and entry.
|
5/14/2003
| JNP |
|
|
Provide 29" clear opening to one bathroom.
|
5/14/2003
| JNP |
|
|
Indicate on plans how the opening protection will be met. (impact glass, shutters, or wood panels)
|
5/14/2003
| JNP |
|
|
Provide interior bearing wall detail.
|
5/14/2003
| JNP |
|
|
Provide embedment detail for 3/4" threaded rod installed at T28.
|
5/14/2003
| JNP |
|
|
Provide fastening schedule for all uplift connections shown on plans.
|
5/14/2003
| JNP |
|
|
The 10" anchor bolts shown on sheet A6 spaced 4'OC gives an actual embedment of 7". 7" embedment provide a maximum uplift of 785 per truss. Please revise the spacing on the interior and exterior walls using this value. Provide calculations and documentation if you disagree with these values.
|
5/14/2003
| JNP |