1. As per the Florida Building Code and the 2012 Florida Accessibility Code for Building Construction; Section 233.3.6 - All new single-family houses, duplexes, triplexes, condominiums, and townhouses shall provide at least one bathroom, located with maximum possible privacy, where bathrooms are provided on habitable grade levels, with a door that has a 29-inch clear opening. However, if only a toilet room is provided at grade level, such toilet room shall have a clear opening of not less than 29-inches.
|
| |
|
|
2. The Architectural drawings and Product Approval indicate Metal Roof cover whereas the Engineering indicates Tile, and the Florida Energy form indicates Composite Asphalt Shingles. Please correlate the application.
|
| |
|
|
3. The structural Engineering indicates a Roof Load Top Cord Dead Load of 20 PSF whereas the Truss Engineering indicates a TCDL of 7 PSF. Please review and revise.
|
| |
|
|
4. The Footing information for the "F5" footer appears to be missing.
|
| |
|
|
5. References to the Balcony Post Base detail can be found on Sheet S70. It appears Sheet 7.0 is missing.
|
| |
|
|
6. An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged.
|
| |
|
|
7. General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
| |
|
|
8. Pen and ink changes, white-outs, or any such altering of raised seal engineering drawings, is not permitted under state laws governing the practice of Architecture or Engineering. All information on the raised seal drawings must part of the printed sheets at the time the drawings are sealed by the Architect/Engineer.
|
| |