SJC Home
Clearance Sheet R2002-001375*001

 Department IssuesSigned OffIntl

ENGINEERING/WIND EXPOSURE: There is conflicting Wind Exposure information on the plans. The first page Design Criteria shows Exposure 'D'. The second page in Design Loads shows Exposure 'C'. And finally the Truss Engineering is designed to Exposure 'B'. Please evaluate the wind exposure, it appears to exceed 5000 ft. of flat unobstructed area (12,000 ft approximately), (per FBC-R301.2.1.4 Exposure D). Things need to match.

 

2/12/2019 dking

HEALTH DEPARTMENT REVIEW REQUIRED: Please provide an approved Health Department Review and/or permit for the well and Septic systems. The approved Site and Floor Plan should appropriately match that of the Building plans.

2/12/2019 dking