PLEASE PROVIDE ENGINEERED DRAWINGS OF PROPOSE BULK HEAD /RETAINING WALL . NOTE ARMY CORP OF ENGINEER PERMIT IS REQUIRED PER EPA REPORT THAT WAS SUBMITTED.