1)Please provide a completed v zone design certificate and pile inspection affidavit.

3/17/2016 blaw

2)Please explain why there is a truss package when the EOR is utilizing conventional framing for the floor, ceilings and roof system. In the event trusses are being used please have the engineering changed to reflect this and have the EOR review and approve the truss package as per Florida Statute 61G15-31-.003  3/16/16 The EOR has not reviewed and approved the truss package.

 

3)Please provide the new duct layout for the remodeled area and unit sizing sheets as per R403.6 of the 2014 FBC-Energy, if the same units are to remain active please have the mechanical contractor verify the size is adequate and display this on a company letterhead with his license number.3/16/16  Please indicate duct sizes

 

4)Please provide an underlayment on the product approval sheets.

3/17/2016 blaw

5)Please provide the finished elevations as it appears only the existing are provided. 3/16/16 The approved site plan has not changed

 

6)Please provide details on the roof by builder as referenced on S1.3 of the engineering.

3/17/2016 blaw

7)Please show the septic tank on the site plan as per 107.3.5 of the 2014 FBC. 3/16/16 The approved site plan for the zoning/clearance department does not comply with 107.2.5 or 107.3.5

 

8)Please provide a typical wall section showing all flashings, building envelope, and stucco details as per 107.2.4 of the 2014 FBC

3/17/2016 blaw

9)Please provide the information on the elevator. 3/16/16 Please demonstrate elevator installation in a special flood hazard area per FEMA  technical bulletin 4

 

10)Please include a smoke detector on the 1st floor.

3/17/2016 blaw

11)Please include dimensions on the site plan for the addition. 3/3/16 the approves site plan has not changed

 

12)Please provide a current elevation certificate and an analysis of the existing piles as this renovation will trigger substantial improvement protocols. 3/16/16 EC Not provided

 

13)Please show tempered glass at the Master bath within 5' of the shower as per R308.4.5 of the 2014 FBC-Res.

3/17/2016 blaw

14)Please demonstrate compliance with 1612.5 of the 2014 FBC. A note on the engineering from the EOR would be sufficient.

3/17/2016 blaw

15)Sheet 0.0 of the engineering references the 2010 FBC on the center column at the bottom, please review and adjust as necessary.

3/17/2016 blaw

16)Please be aware that no habitable area can be below DFE. The first floor plan shows equipment, game room, etc that will have to comply with fema regulations of a VE 15(VE 13 + 2' ft freeboard). No wires or penetrations are permitted in break away walls down stairs, no non flood resistant materials are to be utilizing (sheet rock, carpet, paneling, etc.). This project is a substantial improvement the entire project will be brought into compliance, this includes existing conditions. Please review R322.3 of the 2014 FBC Res, fema technical bulletin 2,4 and 9 for flood zone related issues.

 

17)Please be aware of the interior stair requirements below DFE in the foyer.

 
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.