Clearance Sheet R1999-004499*002

 Department IssuesSigned OffIntl

1)Please provide a completed v zone design certificate and pile inspection affidavit.

 

2)Please explain why there is a truss package when the EOR is utilizing conventional framing for the floor, ceilings and roof system. In the event trusses are being used please have the engineering changed to reflect this and have the EOR review and approve the truss package as per Florida Statute 61G15-31-.003

 

3)Please provide the new duct layout for the remodeled area and unit sizing sheets as per R403.6 of the 2014 FBC-Energy, if the same units are to remain active please have the mechanical contractor verify the size is adequate and display this on a company letterhead with his license number.

 

4)Please provide an underlayment on the product approval sheets.

 

5)Please provide the finished elevations as it appears only the existing are provided.

 

6)Please provide details on the roof by builder as referenced on S1.3 of the engineering.

 

7)Please show the septic tank on the site plan as per 107.3.5 of the 2014 FBC.

 

8)Please provide a typical wall section showing all flashings, building envelope, and stucco details as per 107.2.4 of the 2014 FBC

 

9)Please provide the information on the elevator.

 

10)Please include a smoke detector on the 1st floor.

 

11)Please include dimensions on the site plan for the addition.

 

12)Please provide a current elevation certificate and an analysis of the existing piles as this renovation will trigger substantial improvement protocols.

 

13)Please show tempered glass at the Master bath within 5' of the shower as per R308.4.5 of the 2014 FBC-Res.

 

14)Please demonstrate compliance with 1612.5 of the 2014 FBC. A note on the engineering from the EOR would be sufficient.

 

15)Sheet 0.0 of the engineering references the 2010 FBC on the center column at the bottom, please review and adjust as necessary.

 

16)The review is incomplete at this time due to missing information.

 
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.