Clearance Sheet N2026-001608

 Department IssuesSigned OffIntl

Issues Report For FIRE

Fax Copy
Clearance Sheet: C2004-003483*002
Project Name: PVIC - Conference Center Interior Renovation
Project Address: 210 PONTE VEDRA BLVD
Contractor: ZEVAS, CONSTANTINE C.

DEPARTMENTS:

FIRE SERVICES

Reviewed By :


Issued: 5/13/2026 7:55:33 AM

Plan reviewed for a Level 2 alteration to an existing 16,983 SF, single story, Type IIB fully sprinklered with fire alarm business/assembly space.

The kitchen area is not part of this scope of work.

Panic hardware has been added to Doors 104A and 104B. Ballrooms
----------------------------
Reviewed using FFPC 8th edition effective Dec. 31, 2023. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  


Sign Off: 6/12/2026 11:16:00 AM jlhatcher



Issued: 5/13/2026 8:17:13 AM

1. The life safety sheet indicates the occupant load for the 3,385 SF ballroom #1 is 226 occupancy the factor of 15(less concentrated).

The life safety sheet indicate the occupant load for the 3,027 SF ballroom #2 is 202 occupancy the factor of 15(less concentrated).

NFPA 101:7.3.1.2 uses a factor of 7 for the occupant load of assembly areas where no fixed seating is being used. The plans do not show any fixed seating in the ballroom area.

Re-evaluate this area using a factor of 7. In addition, the plans show that these spaces can be used as one ballroom. Evaluate this space using the increased occupant load regarding egress capacity and number of means of egress.

---------------------------------

Friday, June 12, 2026 JLH

AOR response- We have recalculated the occupant load factor using a rate of 7 net and revised our life safety sheet A0.10.

 


Sign Off: 6/12/2026 10:36:49 AM jlhatcher



Issued: 5/13/2026 8:25:02 AM

2. NFPA 101:13.7.9.3 requires that every room constituting an assembly and not having fixed seating shall have a legible and durable occupant load of the room placed in a conspicuous place near the exit of the room. 

Add this requirement to the plans.

---------------------------------

Friday, June 12, 2026 JLH

AOR response- We will comply and add placards in the necessary assembly rooms displaying the occupant load.


Sign Off: 6/12/2026 10:38:04 AM jlhatcher



Issued: 5/13/2026 8:40:44 AM

3. Plans indicate that motion sensors will be used for the normal overhead lighting in the areas of egress. Provide a specific note and detail on the electrical sheets to indicate how you will comply with the following:

NFPA 101 7.8.1.2.2: (1) Switch controllers must be listed, (2) Switch controllers equipped for fail-safe operation and evaluated for this purpose, (3) Timers be set for a minimum 15 minute duration, (4) Motion sensor be activated by any occupant movement in the area served by lighting units. (5) If building has a fire alarm, activation of fire alarm must activate the switch controller. (6) Lighting control device may not turn off any lights realized upon for activation of photo luminescent exit signs or path markers. (7) Lighting control devices may not turn off any battery equipped emergency luminaries, unit equipment or exit signs.

The requirement regarding motion sensors and the fire alarm indicate that the normal overhead lighting will turn (if not already on) on when the fire alarm is activated. Sheet E101 has a note regarding the emergency lights being tied to the inverter and will be tied to the fire alarm.

If the intent is to use the emergency lighting to light the egress path when the fire alarm activates, the emergency lighting must maintain at a minimum 1 foot candle of illumination throughout the space and not an average of 1 foot candle. Provide photometrics that the minimum 1 foot candle of illumination is maintained in all spaces.(not average)  

---------------------------------

Friday, June 12, 2026 JLH

AOR response- Illumination of the means of egress is provided per NFPA 101:7.8.1.2.2. The drawings are modified to clarify the occupancy sensor shall be interconnected to the fire alarm system as required by a UL listed transfer relay which will enable the fire alarm system to override the automatic controls as required. Clarifications are provided to make clear the emergency lighting is required to meet 101:7.9 and not 101:7.8.


Sign Off: 6/12/2026 10:47:31 AM jlhatcher



Issued: 5/13/2026 9:14:36 AM

4. Sheet E101 indicate that special locking arrangements via a card reader will be  installed on the rear exit door by corridor(113)(Vestibule 111). This door is showing lever lock hardware. Sheet E000 provides the card reader detail. Note 4 detail show a electrically locked egress door assembly (NFPA 101:7.2.6.3) and notes 6 and 7 show sensor releasing electrical locking via  motion sensor and a push to exit button. (NFPA 101:7.2.1.6.2).

Sensor release and electrically locked assemblies are two distinct processes and are not allowed to be intermingled.

Evaluate the locking arrangement and door hardware for this door.

---------------------------------

Friday, June 12, 2026 JLH

AOR response- This detail covers many different types of door hardware. Final door arrangements/hardware to be determined during the shop drawing phase.

Reviewer's response: In order to move this project along, I will place a hold for a revision to be submitted concerning this locking arrangement. Please keep in mind some locking arrangements need to be tied to the fire alarm and could require additional wiring to be ran as well a revisions to approved fire alarm plans if already approved before the decision is made.


 



Issued: 5/13/2026 11:43:43 AM

5. Sheet E101 shows a lighted exit sign installed in the corridor 113 leading thru a door to the outside (Card reader door.)

Provide a lighted exit sign above this door that leads directly to the exterior.  (Vestibule 111)NFPA 101:7.10. 

----------------------------------

Friday, June 12, 2026 JLH

AOR response- Exit sign added as requested, refer to floor plan lighting sheet E101


Sign Off: 6/12/2026 11:03:32 AM jlhatcher



Issued: 5/13/2026 12:08:38 PM

Sheet A 301

6. Door hardware was provided for the new doors from the ballroom(104A, 104B). Provide detail of the existing doors and door hardware such as panic hardware to verify code compliance.

-----------------------------

Friday, June 12, 2026 JLH

AOR response- All existing doors from the assembly occupancy areas have the code required panic hardware(see attached photos)


Sign Off: 6/12/2026 11:10:03 AM jlhatcher



Issued: 5/13/2026 12:21:00 PM

Sheet A101

7.Plans show the location of the relocated fire extinguisher and cabinet. NFPA 10. will require fire extinguishers at least every 75'.

Update the plans to show compliance.

----------------------------

Friday, June 12, 2026 JLH

AOR response- Please refer to sheet A0.10 life safety plan for added fire extinguisher locations.


Sign Off: 6/12/2026 11:15:33 AM jlhatcher



Issued: 5/13/2026 12:23:07 PM

A HOLD has been placed at insulation inspection (109) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating they evaluated that the existing system meets the occupancies Code requirements and no work to be done to the existing system to meet Code based on the work in this permit:

- Special locking arrangement-See Reviewer note 4.
- Fire Alarm System (card reader)(occ sensors)(emergency lights )(duct smoke detectors)(Surge protection)red housing-change to white)
- Fire Sprinkler System
- In Building Radio Permit or Passing Test Report(E000 Note 6)

 


Sign Off: 6/12/2026 11:15:40 AM jlhatcher



Issued: 5/13/2026 12:23:31 PM

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- Wall and ceiling finish will meet Class A, B or C. 101:38.3.3.2.2

- Floor finish shall meet either: a) ASTM D 2859 for carpet and carpet like materials or b) has a minimum critical radiant flux of .1 W/cm2 for non-carpet flooring. 101:38.3.3.3.3.

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.


Sign Off: 6/12/2026 11:15:47 AM jlhatcher



Issued: 5/13/2026 12:23:41 PM

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed.


Sign Off: 6/12/2026 11:15:51 AM jlhatcher


9/3/2026 jlhatcher