This is a modification to an existing Church The plans are adding 3 Sunday school classrooms in a large open space that is separated with accordion partitions. The bldg. is not protected with fire sprinklers.

We are unable to approve the plans as submitted. Please provide a life safety plans and identify the occupant load as we discussed per a phone conversation 5/3/16.

Sprinkler will not be required.

Plans REJECTED

****************************************

5-17-16

The resubmittal did not address previous issues listed above. There are also draft occupant load calculation on the old page to refer to.

Plans REJECTED

****************************************************

5-18-16

The contractor came in and we modified the plans to address our comments.

There is a calculation for a main gathering area and a storage area for the tables & chairs.

The doors to the gathering area are being equipped with panic hardware as the largest occupant load exceeds 100 persons.

Plans APPROVED

5/18/2016 JRuley