Clearance Sheet N2015-002497

 Department IssuesSigned OffIntl

This alteration was a Pride Complaint, a site visit from the Building Department must be performed. Please provide a right of entry letter for the inspection.

8/28/2015 ccrain

Please have the engineer of record state the level of alteration of this project.

8/28/2015 ccrain

Please provide floor trusses, beams or any other support details of this new floor system.

 

8/28/2015 Unable to locate engineered floor trusses with the re submittal.

 

9/8/2015 Unable to locate engineered floor trusses with the 2nd re submittal.

 

Please provide energy sheets and duct layout for the additional conditioned space.

8/28/2015 ccrain

Need window and door sizes on the plans.

8/28/2015 ccrain

Need wall section & exterior wall covering details for the new walls that will be built out on the existing porches.

8/28/2015 ccrain