SJC Home
Clearance Sheet M2024-002998*010

 Department IssuesSigned OffIntl

Plan reviewed for a new Aboveground Dry Sprinkler System in an Assembly Building. Aboveground System begins 1' AFF at the 6" underground reduced to 4" to supervised control valve to 4" attached FDC (FDC reviewed during separate underground review) to a 4" Reliable Model FX Dry Pipe Valve Assembly to a 4" Galvanized pipe to Dry System (295 gal.). A C-Aire S110R-LD1-115-PD .5 HP air compressor to be mounted to riser.

Reviewed using FFPC 8th edition effective Dec. 31, 2023. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.

Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  

10/15/2024 dfeagle

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center. You may not make handwritten alterations on signed and sealed plan pages.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages from the JOB Copy will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code, 8th Ed.

10/15/2024 dfeagle

1) How is the forward flow test of backflow to be achieved? 13:16.14.5, 13R:6.8.9

Tuesday, October 15, 2024 1225 hrs. DF: Spoke with Randy Bode with Century Fire Protection. It was agreed to sign this comment off and place a HOLD 604 Inspection (aboveground hydro) for a revision to address the Forward Flow Test comment on Building #7 (M24-2998*6).

10/15/2024 dfeagle