| | Department Issues | Signed Off | Intl |
|
|
Plan reviewed for Gate House Fire Alarm System. The Gate House will be receiving (as they come on line) signals from the Oak Bridge complex buildings and transmitting the signals to the monitoring company.
Reviewed using FFPC 7th edition effective Dec. 31, 2020. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.
Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
**************************
Thursday, August 4, 2022 DF: Review of 1st resubmittal.
**************************
Thursday, August 11, 2022 DF: Review of 2nd resubmittal.
NOTE: INSPECTOR; SEE COMMENT #3 and #4.
|
8/11/2022
| dfeagle |
|
|
RESUBMITTING: A. Make necessary changes and resubmit everything in person to the Permit Center. B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit. C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional. - The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8". - Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)
|
8/11/2022
| dfeagle |
|
|
1) 1 set of plans for 5 clearance sheets (M21-4383, M22-285, M21-6999, M21-4308 and M21-4310). This comment will not be signed off until both clearance sheets have all other comments addressed.
**************************
Thursday, August 4, 2022 DF: RTC: Understood.
Thursday, August 4, 2022 DF: Reviewer's Response: Received Updated plans that contains the Clubhouse, Flats 1 and 2, Generator building and the Gate House. I received the response to comments for the Clubhouse only. I did not receive a clearance sheet, application and packet for the Gate House; (M21-285).
I can not approve any of the buildings until ALL clearance sheets, applications and packets have been received and approved.
|
8/11/2022
| dfeagle |
|
|
2) Need a Fire Marshals Permit Application for the Gate House along with the manufacturer's specification sheets for the devices and equipment.
**************************
Thursday, August 4, 2022 DF: No clearance sheet, application and packet was received for the Gate House.
|
8/11/2022
| dfeagle |
|
|
3) Office 103 and main room 101 need visual notification devices. 101:9.6.3.5
**************************
Thursday, August 4, 2022 DF: No response to comments, no change on plans.
**************************
Thursday, August 11, 2022 DF: RTC: Notification added to main room but not the office. If the office does not have glass in the doors and / or the Fire Inspector determines at time of the Fire Final that the visual notification is inadequate, you will have to install an notification device in the office.
|
8/11/2022
| dfeagle |
|
|
4) The gate house is sprinkled. I do not see any tamper and flow switches for the sprinkler riser and connection to the sprinkler alarm bell. 101:9.7.2.1
**************************
Thursday, August 4, 2022 DF: No response to comments, no change to plans.
**************************
Thursday, August 11, 2022 DF: RTC: No response to comments. Sheet FA-4 does not indicate any tamper switch monitoring of a back flow. I checked the underground plans for this building and no back flows were shown.
NOTE: If Back Flow Preventers are installed the control, valves for the BFP shall be monitored for tamper.
|
8/11/2022
| dfeagle |
|
|
5) The fire underground plan set has not been reviewed at this time. Should there be a Post Indicator Valve (PIV) such as are provided for the other buildings or a back flow preventer assembly (BFP) for this sprinkler system you will need to provide tamper monitoring.
Indicate this on the plans.
**************************
Thursday, August 4, 2022 DF: No response to comments.
**************************
Thursday, August 11, 2022 DF: RTC: See comment #4.
|
8/11/2022
| dfeagle |