SJC Home
Clearance Sheet M2021-009453

 Department IssuesSigned OffIntl

Plan submitted for access control permit. Submitted were changes made on A1.01 and A4.11 which now show locks/latches. Scope of work is to address door locking arrangements for 6 doors. Reviewed using FFPC 7th edition effective January 1, 2021. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Reviewer: V.Vitori   
For questions regarding comments you may reach me at either: 904 209 1748 or vvitori@sjcfl.us.
To schedule fire inspections call 827 6842 (automated system).
Questions about inspections or resubmitting your plans call 209 1740x1.

Wednesday, September 13, 2023 T pages revised to show what is now intended. 2 revised door locking arrangement locations.

9/13/2023 VVitori

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the Permit Center.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit. All plan pages must be the same size.
C. Provide a response to comments along with any supporting documentation.  Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)

9/13/2023 VVitori

1) 2 pages were revised (A1.01 and A4.11) to show new locks and latches that do not match what was previously reviewed and approved as part of the original building plans (T pages and review comment 10). The locking arrangement you are now showing on A1.01 and A4.21 do not match the approved technology page. If you are revising  (adding more locks, new locks, changing from what was submitted before) those locks/latches, then revise the previously submitted T pages.

Wednesday, September 13, 2023 T pages revised to show what is now intended. 2 revised door locking arrangements. Now that I can see what is going on, review comments will begin with comment 4.

9/13/2023 VVitori

2) CR6 at bottom of page A4.11 was cut off. Make sure this will be visible on technology pages.

Wednesday, September 13, 2023 T pages revised to show what is now intended. 2 revised door locking arrangements. Now that I can see what is going on, review comments will begin with comment 4.

9/13/2023 VVitori

3) If the scope of the currently submitted revised pages only covered locks then withdraw these pages from revision so they do not conflict with approved plans.

Wednesday, September 13, 2023 T pages revised to show what is now intended. 2 revised door locking arrangements. Now that I can see what is going on, review comments will begin with comment 4.

9/13/2023 VVitori