Plan reviewed for Generator Building Fire Alarm System. Edwards Intelligent FACP model EST iO64RD addressable system. FACP reports to the Gate House Main FACP and the Gate House FACP dials out to monitoring company.

Reviewed using FFPC 7th edition effective Dec. 31, 2020. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.

Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  

**************************

Thursday, August 4, 2022 DF: Review of 1st resubmittal.

**************************

Thursday, August 11, 2022 DF: Review of 2nd resubmittal.

8/11/2022 dfeagle

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the Permit Center.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit.
C. Provide a response to comments along with any supporting documentation.  Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)

8/11/2022 dfeagle

1) 1 set of plans for 5 clearance sheets (M21-4383, M22-285, M21-6999, M21-4308 and M21-4310). This comment will not be signed off until both clearance sheets have all other comments addressed.

**************************

Thursday, August 4, 2022 DF: RTC: Understood.

Thursday, August 4, 2022 DF: Reviewer's Response: Received Updated plans that contains the Clubhouse, Flats 1 and 2, Generator building and the Gate House. I received the response to comments for the Clubhouse only. I did not receive a clearance sheet, application and packet for the Gate House; (M21-285).

I can not approve any of the buildings until ALL clearance sheets, applications and packets have been received and approved.

**************************

Thursday, August 11, 2022 DF: RTC: Understood

8/11/2022 dfeagle

2) ALL fire pump system control valves open or closed are required to be supervised. NFPA 20:4.17 It is not clear if all valves are shown supervised. I see only one FTM for the DCDC BFP for example. Dry Riser?

SJC requires the valves to be supervised by the FACP. Verify ALL control valves are supervised.

**************************

Thursday, August 4, 2022 DF: No Response To Comments Provided. Provide a response to comments.

**************************

Thursday, August 11, 2022 DF: RTC: Will comply, Added additional flow/tamper modules. Refer to Sheet FA-4.

8/11/2022 dfeagle

3) There is a Post Indicator Valve (PIV) or a back flow preventer assembly (BFP) for this sprinkler system. I do not see the supervision connection for this PIV / BFP. You will need to provide tamper monitoring.

Indicate this on the plans.

**************************

Thursday, August 4, 2022 DF: RTC: The supervision for the PIV is shown in the Generator building in Fire/Water 104. See Sheet FA-4. The PIV location was verified in the field.

8/4/2022 dfeagle

4) Will the fire alarm be monitoring the level 1 generator in accordance with NFPA 110:5.6.6, OR will there be a level 1 generator remote annunciator meeting 110:5.6.6 monitoring the generator in the Gate House?

If the remote annunciator is the method of monitoring the level 1 generator you will need to provide a letter from the owner that the generator will be monitored by a constantly occupied Gate House and that at no time will the gate house be unoccupied. Keeping in min the Gate House Occupant cannot go on roving patrols leaving the Gate House unoccupied.

If the Fire Alarm System will be monitoring the Level 1 Generator the following point will need to be monitored:

110:5.6.5.2(4)

Individual alarm indication to annunciate any of the conditions listed in Table 5.6.5.2 and with the following characteristics:

(a) Battery powered

(b) Visually indicated

(c) Have additional contacts or circuits for a common audible alarm that signals locally and remotely when any of the itemized conditions occurs

(d) Have a lamp test switch(s) to test the operation of all alarm lamps

 

See Table 5.6.5.2 for the required conditions to be monitored and annunciated.

NOTE: The level 1 generator Fire Marshal Permit had not been provided for review at the time of the review of this plan.

**************************

Thursday, August 4, 2022 DF: No Response To Comments Provided. Provide a response to comments.

**************************

Thursday, August 11, 2022 DF: RTC: 110:5.6.5.2(4) Individual alarm indication of any of the conditions listed in Table 5.6.5.2 and with the following characteristics: a) Battery Power, b) Visually Indicated, c) Have additional contacts or circuits for a common audible that signals locally and remotely when any of the itemized conditions occurs, d) Have a lamp test switch(s) to test operation of all alarm lamps.

8/11/2022 dfeagle

5) No fire alarm pull station or pull stations noted in the building. Provide a FA Pull Station or pull stations. 101:40.3.4.2(3) 

**************************

Thursday, August 4, 2022 DF: No Response To Comments Provided. Provide a response to comments. Note: none added to sheet FA-4.

8/11/2022 dfeagle

6) No audible and visual notification devises noted in the fenced in area around the fuel tank. Egress through this area from inside the building. 101:40.3.4.3, 101:9.6.3

**************************

Thursday, August 4, 2022 DF: No Response To Comments Provided. Provide a response to comments. NOTE: Non added to Sheet FA-4.

8/11/2022 dfeagle

7) Electrical (FACP) room 104 need visual notification devices. 101:9.6.3.5

**************************

Thursday, August 4, 2022 DF: No Response To Comments Provided. Provide a response to comments. NOTE: None added to Sheet FA-4

8/11/2022 dfeagle