Clearance Sheet M2021-006791

 Department IssuesSigned OffIntl

Plans for a 6997sf 3 unit apartment building (triplex) that was reviewed using the apartments chapter.  The building will be provided with a fire sprinkler system and a fire alarm system to monitor the sprinklers.   


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

 

2/8/2022 PWebb

1) Informational Only

The showers in this building are Zero entry, therefore grab bars are not required per NFPA 101:24.2.8.1.2.  An email from the architect indicating this has been printed and included in the plan package for the archive. 

 

2/8/2022 PWebb

2) INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating no work to be done to the existing system:
- Fire alarm system (sprinkler monitoring)
- Fire sprinkler system

 

2/8/2022 PWebb

3) A fire alarm is required to monitor the fire sprinkler system.  A hold has been placed on the permit for this information. 

 

2/8/2022 PWebb