Plans for the installation of 3 CaptiveAire kitchen hoods as indicated below:


Hood 1- 12' indicated to have 12x12 ducts
Hood 2- 9' abutted to hood 3 indicated to have 12x14 ducts
Hood 3- 8' abutted to hood 2 indicated to have 12x14 ducts
Hood 4- Type II hood not included in this review


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744 pwebb@sjcfl.us
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

2/15/2022 dfeagle

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications must be submitted to the Permit Center as a resubmission for the original project.

Effective 1/01/2022 you must include a written response to comments summary to clarify and illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

Resubmittals will not be approved without a response to comments. 

2/15/2022 dfeagle

1) What is the wall behind the hood and the cooking equipment constructed of?  Demonstrate compliance with NFPA 96:4.2 or 4.2.3 all the way from the top of the hood to the floor. 

2/15/2022 dfeagle

2) On the roof plan provided, identify or callout the exhaust fans and makeup air applicable to your submittal.  This can be by clouding, highlighting, notations etc.  NFPA 96:7.8.2.1.

2/15/2022 dfeagle

3) The exhaust fan does not indicate that it is provided with a hinge, hold open retainer and flexible conduit.  NFPA 96:7.8.2.1, 8.1.2.1. 

2/15/2022 dfeagle

4) Provide manufacturers specification sheets for all equipment and components including but not limited to: upblast fan (8.1.1), filters(6.1.1,6.2.3.1), hood lights(9.2.2),  etc.

Tuesday, February 15, 2022 DF: Equipment Line Up Provided:

HOOD 1: Line up Left to Right

Refrigerator      Vulcan      ArS72

36” 4 Eye Range   Vulcan      V4B36C

Oven/Steamer      Rational    ICP6-FULL NG (2ea.)

 

Hoods 2 and 3 Line Up Left to Right:

Refrigerator      Vulcan ARS72

24” Griddle       Vulcan MSA24-C0100P

25” Charbroiler   Vulcan VACB25

36” Salamander    Vulcan 36IRB-N

Plate Rail        Vulcan PLTRail-24

Plate Rail        Vulcan PLTRail-24

24” 4 Eye Burner  Vulcan      VHP 424

Stone Hearth Oven Wood Stone  FD-6045-REFG-L-IR

2/15/2022 dfeagle

5) How will you ensure that the cooking equipment will be returned to its original location?  Demonstrate compliance with NFPA 96:12.1.2.3.1. 

Tuesday, February 15, 2022 DF: Cut sheet for "Safety Set" which is a position specific wheel chalk.

2/15/2022 dfeagle

6) Will the ducts be fabricated or listed assemblies.  If listed provide the listing information.  Also indicate the sealant that is required in the listing as well as the testing method. 

 Hood 1 on sheet 1, and hood 2 and 3 on sheet 4 show a round duct on the diagram, however the measurements provided are LxW measurements which indicate fabricated square duct.    Provide clarification.  If listed duct is proposed provide duct isometric from CaptiveAire. 

Tuesday, February 15, 2022 DF: Response: Fabricated, Duct to be fabricated rectangular duct, Duct to be fabricated welded B.I..

2/15/2022 dfeagle

7)  Provide an elevation view from the hood all the way to the exhaust fan.  Indicate any changes of direction, location of cleanouts, and clearance to combustibles.  

Tuesday, February 15, 2022 DF: Response: See enclosed sketch SK-M1 & M2.

NOTE: these are 8.5" by 11" sheets not attached top the plan set.

2/15/2022 dfeagle

8) 3m duct wrap is indicated, provide spec sheets. 

2/15/2022 dfeagle

9) Provide manufacturers specifications for the cooking equipment.  NFPA 96:12.1.1

2/15/2022 dfeagle

10) Vertical Duct:  Identify the height of any required duct openings (cleanouts).  If not easily accessible from the ground or a 10’ step ladder, safe access and a work platform will be required per NFPA 96:7.4.2.3.  

Tuesday, February 15, 2022 DF: Response: See enclosed drawing A105 for work platform.

Tuesday, February 15, 2022 DF: Reviewers Response: It is difficult to verify work platform shown on Sheet A105 will allow full access to ALL cleanouts of the hoods shown on sheet M301. The Fire Inspector will verify the platform will allow full access to the cleanouts. If not the platforms will have to be modified to allow access to the cleanouts before the permit can receive an APPROVED Fire Final.

NOTE: I spoke with Terry Parrish (Project Manager via phone; 02/15/22 at 0845 hrs.) regarding the comment above and she is ok with having the Fire Inspector verify at time of the hood duct work inspection/final.

2/15/2022 dfeagle

11) Mechanical floor plans have been provide on sheets M301 and M302 but the plans are very busy.  Identify on the plans where the 3 hoods are located, this can by clouding, highlighter, or whatever means necessary. 

2/15/2022 dfeagle

12) Show and label equipment that will be installed underneath the hood.   Equipment is indicated, but it is not labeled to what it is. 

2/15/2022 dfeagle