1) Double doors 114 are showing they are removed in this revision submittal. Exiting pages A1.02D and A4.32 show the corridor wall to both "open to below" and "cardio" as a 1hour separation. Explain or point out how the opening where door 114 is now being protected. 101:8.3.3
Thursday, July 27, 2023 Looking at the newly submitted A8.20 page I do not see (In these revised pages nor existing approved scanned in pages) where the wall that separates the corridor from cardio is fire rated to maintain exit access corridor fire rating. 101:30.3.6
I showed Supervisor Gedris and he called his contact for this project and said I will hold plan in my office until Monday July 31, 2023 looking for something to show that the wall maintains the fire rating.
Friday, July 28, 2023 New plan page A8.20 dropped off showing this wall is now 1 hour fire rated.