Do not forget to:
- ID control, drain, and test connection valves with a weatherproof metal or rigid plastic sign. NFPA 13r 5.2.12.4
- include a atleast 3 spare sprinklers of each type, temperature rating, and orifice size used in the system to be installed on the premisies. NFPA 13r 6.5.1
- call for hydro test to be conducted in accord with NFPA 13. NFPA 13r 6.4.2.1
- have insulation installed at sprinkler final as shown on page FPD.1 to show compliance with NFPA 13r 5.3 and 6.1.4.
- label FDC in accord with NFPA 13r 6.7.4.3