1)Sheet 000 general notes 1 and 2 reference the wrong code cycle.
|
5/12/2016
| jadams |
|
|
2)Please provide product approval sheets
|
5/12/2016
| jadams |
|
|
3)Door 107 B does not comply with 320.1.1 of the 2014 FBC-R
|
5/12/2016
| jadams |
|
|
4)Please provide a current elevation certificate for this building as this renovation will trigger the substantial improvement requirements from FEMA.
|
5/12/2016
| jadams |
|
|
5)Please provide a clearance sheet and an approved site plan which complies with 107.2.5 of the 2014 FBC
|
| |
|
|
6) Sheet E 201 shows a 20 amp panel please explain
|
5/12/2016
| jadams |
|
|
7)Please provide smoke detectors and carbon monoxide detectors on the electrical layout.
|
5/12/2016
| jadams |
|
|
8)Please provide water proofing details for rear porch.
|
5/12/2016
| jadams |
|
|
9)Please provide energy sheets for this building as applicable.
|
| |
|
|
10)Please explain the design code reference to the 2014 FBC -Residential as this is a condo building per the property appraiser web site
|
5/12/2016
| jadams |
|
|
11)Review is incomplete at this time
|
5/12/2016
| jadams |
|
|
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal. If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again. ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
|
| |