1)These comments are for the entire building.

 

2)sheet a 1.0 indicates that this a 7 unit townhome however it is a 6 unit, please revise.

9/22/2015 blaw

3)Sheet a3.3 excerpt of 806.1 appears to be incorrect, please review and revise

9/22/2015 blaw

4)The roof vent locations do not appear to be iaw 806.2 on sheet a3.3

9/22/2015 blaw

5)Please provide typical wall details showing siding applications as the majority of ones provided are for stucco.

9/22/2015 blaw

6)Sheet a3.3 shows ridge vents being used in conjunction with off ridge vents, please review and revise.

9/22/2015 blaw

7)Please provide the rated walls that extend past the 2 hour separation walls on the zero lot lines.

9/22/2015 blaw

8)Please explain with code references that allow overhangs past the lot line.

9/22/2015 blaw

9)Please review the exposed wall perimeter on the energy sheets for the garage.

 

10)Please identify powder door size on sheet A4.2.1

9/22/2015 blaw

11)Please review the water heater locations as the ones in the interior units are shown in the garage, however the energy sheets indicate exterior on all six units.

 

12)Please explain in detail how to vent the water heaters in the garage iaw the manufacturer instructions, provide minimum separation to electrical components and all applicable information.

 

13)Please review the reference 1/AD1 as a U336 wall, this reference is at the garage wall throughout the plans.

9/22/2015 blaw

14)Please explain the batten and board at the front of the building on the product approval sheet (hardi panel?)

 

15)Please provide the installation instructions for the brand of the shaft liner system to be used at the 2 hour separation wall from the manufacturer.

 

16)Truss FG03 appears to be missing a center bearing support at the stairway, please review this truss

 

17)Please show compliance with table R302.1(1)of the 2014 FBC-R as it applies to the rear porches.

 

18)The 1 hour wall section on sheet AD.5 does not show the 5/8" Densarmor extending to the roof deck, please revise drawing.

 

19)Smoke detectors are not referenced in section 313 of the 2014 FBC-Res as stated on the electrical layouts, please review and revise as necessary.

 
An additional fee due and payable at permitting shall be of $100 each for any second resubmission of plans. Per FL. Statute 553.80(2)(b), on any third and subsequent resubmissions that do not correct a code violation that is specifically and continuously noted in each previous rejection, a fee of four times the amount of the fee attributed to plan review will be charged.  
General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.
If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.
ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.