SJC Home
Clearance Sheet C2026-003501

 Department IssuesSigned OffIntl

Please clarify the occupant load. On sheet A-001 the plumbing fixture calculation shows 226 occupants and sheet A-010 shows an occupant load of 390. Please clarify and make the corrections necessary to show the correct occupant load.

9/23/2026 shillyard

Please have the engineer of record sign and seal the structural pages.

10/15/2026 shillyard

Please submit a second copy of the energy calculations.

10/15/2026 shillyard

Sheet S301c in the set marked JOB COPY is printed the wrong direction and one of the details is missing. Please replace this page.