1) Provide an itemized revision narrative for all provided sheets. Remove any sheets that are not intended to be included. Provide 2 identical plan sets for review.
--------------
Thursday, October 29, 2026 PJW- Itemized Revision narrative provided for the following sheets: A-001, A-010.1, A-100.1, A-100.1.1, A-101.1B, A-101.2B, A-103, A-201, S-101.1.A, S-101.1.B, S-101.1.C, S-102.1.B, S103.1.C, S103.2, S-201, S-202, S-207, S-208, S-209, S-503, S-505, M-001.1, M-001.2, M-101.1.B, M-103.1, P-001.1, P-101.1.B, P-103.1, P-202.1, P-402.2, P-404.1, E-002.2, E-002.3, E-101.1.A, E-101.1.B, E-103.1, E-201.1.B, E-203.1, E-301.1, E-501.1, E-501.2, E-601.1, E-603.1, E-604.1, E-605.1, E-701.1, FA-001.1, FA-101.1B, and FA-101.1.C.
Sheets A-202, A-402, and A-601 were provided but not included in the narrative. I was able to determine what the revisions were on these sheets, no need to add to the narrative.
The mechanical sheets indicated in the revision narrative were note provided. Provide the sheets, or update the narrative to remove them.
The structural sheet narrative indicates "see attached narrative". I do not see any attached structural narrative. However the Fire Marshal's office does not typically review structural sheets, so I will leave that to the building department for follow-up.