Clearance Sheet C2025-001992

 Department IssuesSigned OffIntl

405.3.2 Public lavatories.

In employee and public toilet rooms, the required lavatory shall be located in the same room as the required water closet.

 

The lavatory vestibule does not meet the requirements of the provided code. Please show the required lavatories with in the room where the required lavatories are located.

8/21/2026 ccrain

Panel HA is shown on the panel schedule but is missing from the riser schedule. Please add

 

The 400 amp MBA is not shown in the panels schedule. Please provide.

 
Informational

Preliminary reviews are one time reviews submitted prior to approval of a clearance sheet and site plan. Because of this, and the documentation and plans are usually insufficient and incomplete, a full review cannot be accomplished without the possibility of adding additional comments at time of future submittals.