Plan reviewed for the installation of a new aboveground fire sprinkler system for a proposed large storage warehouse SHELL. The system is a 3,044 head NFPA 13 system designed with 7 different systems which are fed from 3 different risers that are independently fed from the fire main which connects all three (3) risers.
Each riser has a manifold which serves multiple systems. This is an Early Suppression Fast Response [ESFR] Automatic Fire Sprinkler System designed in accordance with NFPA 13 recommendations to protect Solid-Piled or Single/Double-Row Rack Storage of Class I-IV Commodities and Rack Storage of Cartoned Unexpanded Group A Plastic Commodities. Multiple Row Rack Storage is NOT permitted. Maximum storage height Shall NOT exceed 35’ and Shall maintain a clear distance of at least 3’-0” between the top of storage and sprinkler deflector.
**Riser Details and Systems noted on Sheet FP-8**
1/FP8: 10” underground, 6” Check Valve and manifold to 6” risers for systems #06 and #07
2/FP8: 10” underground, 6” Check Valve and manifold to 6” risers for systems #03, #04 and #05
3/FP8: 10” underground, 6” Check Valve and manifold to 6” risers for systems #01 and #02
Systems Breakdown:
System 01: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 36,842 SF.
System 02: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 38,406 SF.
System 03: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 38,406 SF.
System 04: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 37,192 SF.
System 05: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 38,008 SF.
System 06: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 39,005 SF.
System 07: ESFR Warehouse, Wet, Density: ESFR K-16.8 @ 52 psi, 434 heads, 38,243 SF.
Reviewed using FFPC 8th edition effective Dec. 31, 2023. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.
Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
-------------------------
Thursday, March 6, 2025 DF: Review of 1st Resubmittal.