|   | Department Issues | Signed Off | Intl | 
		
			| 
                            
                         | 
                             1. A new Clearance Sheet is required with the change in occupancy. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             2. Architectural plans with detailed dimensions are required for the 2 new apartments. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             3. New Energy Code is required for the 2 new apartments. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             4. Product Approval Specification Sheets are required for the 2 new apartments. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             5. Please submit Electrical plans for the 2 new apartments. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             6. Please refer to 2023 FBC-Building 107.3.5 for the Minimum plan review criteria for buildings. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             7. Please clarify the Occupancy Classification of the 2 new apartments. Will the occupants be primarily permanent or transient in nature? 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                             8. Please adjust the valuation of this project to reflect the addition of the new apartments. 
                         | 
                            
                         |   | 
		
			| 
                            
                         | 
                            General Notes: Your re-submittal shall include two complete sets of plans. Please insert the revised pages into the plan sets, and pages removed from the stamped "Job copy" set, shall be marked as "old set" and shall be included in the re-submittal.  If old "Job copy" drawings, are not resubmitted there will be additional plan review fee charged due to the amount of time necessary to review entire drawing again.  ALL ITEMS changed or revised on plans and documents shall be identified by circling, clouding or identified by some other legible method. ADDITIONAL ITEMS MAY BE REQUIRED - DEPENDING ON INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.
                         | 
                            
                         |   |