Plan reviewed for New NFPA 13 Wet Sprinkler system. 4" Riser connected to the 6" supply 1'AFF. Then splitting into the 1st FL 4" riser and the 2nd FL 4" Riser. 4" Free Standing FDC connected to the 1st FL riser below the check valve and free flow to both the 1st and 2nd FL risers. There is a BFP Forward Test Header (2 - 2.5" hose valves) connected to pipe from 1st Fl riser on the outside wall.

Reviewed using FFPC 7th edition effective Dec. 31, 2020. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.

Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  

-----------------------------------------------------------------

Tuesday, July 11, 2023 DF: !!!FIRE INSPECTOR - SEE COMMENT #4!!!

7/11/2023 dfeagle

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the permit center.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (Job and Office). One copy of the removed/old pages from the JOB Copy will need to be submitted and marked "OLD". Do not forget to remove pages for work not associated to this permit. All plan papers must be the same size.
C. Provide a response to comments along with any supporting documentation. Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comments was addressed. EX - "Top Left of Page E1-1" or "Page E1 Note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed.

7/11/2023 dfeagle

1) NFPA 13 9.2.1.3.3.2  Provide spec sheet for suspended ceiling tile grid showing it meets ASTM C 635.

 

7/11/2023 dfeagle

2) Sprinkler Legend does not identify the make / model / SIN of the sprinkler head. 13:23.1.3(12)

7/11/2023 dfeagle

3) Provide signage detail for the BFP Forward Test Header. 13:6.6.4.1

7/11/2023 dfeagle

4) Provide a list of the spare sprinklers to be provided. The list is to be installed in the sprinkler head cabinet. 13:6.2.9.7

  1. The list shall include the following:

(1) Sprinkler Identification Number (SIN) if equipped; or the manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure rating

(2) General description

(3) Quantity of each type to be contained in the cabinet

(4) Issue or revision date of the list

---------------------------------

Tuesday, July 11, 2023 DF: A List of Spare Sprinklers was provided for the Spare Sprinkler Head Box. However, The list contains VK302 - 155° Pendent, VK300 - 155° Upright, VK462 - 155° Concealed and VK305 - 200° Sidewall Heads. The Sprinkler Plan Head Legend shows: VK3021 QR - 155° Rec Pendent, VK4621 QR - 155° Concealed, VK3001 QR - 155° Upright, VK305 QR - 200° Sidewall, and VK3001 QR - 200° Upright Heads.

There is a large discrepancy with the types and numbers of sprinklers on the plans and the list representing the replacements for the installed heads.

An Approved Spare Sprinkler List will be required to be installed in the spare head box at time of the Sprinkler Fire Final in order to receive an approved Final inspection.

7/11/2023 dfeagle