1) Plans include Shop Drawings (Sheets 1 and 2), Civil Utility Drawings (C-1, C-2, C-3, C-10, C-11, C-14, C-15, C-16), Domestic Plumbing Sheets (P001, P002 (Med Gas), P101) and Fire Protection Sheets - Aboveground Sprinkler System (FP001, FP100, FP200)
Some of the Civil Drawings conflict with the Shop Drawings (i.e. RPDA vs DCDA BFP).
a) Remove the Civil Drawings, Domestic Plumbing, Med Gas (requires separate permitting)and the above ground Sprinkler Plan Sheets (Sprinkler Plan already submitted) that do not apply and/or conflict.