Plan reviewed for fire sprinkler system in a 7200SF to be mercantile occupancy with 69 sprinkler-heads and sprinkler riser. Reviewed using FFPC 7th edition effective Dec. 31, 2020.

Reviewer: 
Aaron Connell 904-599-8253 aconnell@sjcfl.us 
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

5/23/2022 aConnell

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the Permit Center.
B. Once at the Permit Center swap out altered pages or insert new pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit.
C. Provide a response to comments along with any supporting documentation.  Response to comments is REQUIRED not optional.
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)

5/23/2022, A Connell: Noted response to comments with resub.

5/23/2022 aConnell

1- I do not see a pressure gauge above and below the riser check valve in the riser detail within the submitted sprinkler plans.

Pressure gauges shall be installed above and below each alarm check valve or system riser check valve where such devices are present. NFPA13:7.1.1.2

Please submit a fire sprinkler riser detail showing and listing all of the required components being installed on this project.

5/23/2022, A Connell: Noted response to comments states that there are no check or alarm valves to warrant additional gauge for this riser.

5/23/2022 aConnell

2- I see a spec sheet within the submitted spec sheet packet for an FDC, but I do not see anything within the scope of work. Please clarify if an FDC is going to be within the scope of work. If so, it will need to meet the following criteria:

FDC connections shall be equipped with a five (5) inch Storz connection and shall have a 30 degree downward deflection.

This applies to all FDC’s regardless being on a building or free standing.

NFPA 24:5.9.1.2, and 5.9.2.4

5/23/2022, A Connell: Response states that there are no FDC connections in this scope of work and FDC spec sheets will be removed.

5/23/2022 aConnell