| | Department Issues | Signed Off | Intl |
|
|
KT Carter Contracting, Ray Gauvin 354-9999
Plan REJECTED. Fire sprinkler line is required to be isolated. (NFPA 24, 6.2.9) Please indicate on the plan a valve on this sprinkler line. (It is noted a gate valve submittal sheet was submitted)
|
| |
|
|
Scope of work appears to be removing 6" cap and (gate valve required), extend 6" DR-14 approx. 30' to finish 1' above finished floor.
*A submittal sheet was submitted for a DCDA BFP. If a new BFP being installed, show it on the plan.
**Fire plan reviewer-If no BFP, make sure check valve in fire sprinkler riser.**
|
| |
|
|
A submittal sheet was submitted for a FDC but the plan shows the FDC on the building. Is a freestanding FDC being installed? If not, then the submittal sheet will be removed.
**Per Fire Inspector Supervisor, a two 2 1/2" FDC allowed for this existing complex.**
|
| |
|
|
The following will be checked during fire inspections:
- Top of the pipe shall be buried not less than 2 1/2 ft to prevent mechanical damage (NFPA 24:10.4.2.2.2) - Pipe under driveways shall be buried at a minimum depth of 3 ft (NFPA 24:10.4.2.2.3)
|
| |