Plan Approved for underground fire pain for 9,220 SF CEP building, 218,477 SF 5-story Hospital, and 71,903 Medical Office Building.
Complex:
- 10" DR-18 fire main loop being supplied from 2 separate 10" RPDA BFP's(insulated and monitored with tamper switch) that are connecting to existing JEA 12" and 16" water mains.
- 10" to 8" reducer to supply 8" line to supply 1 of the fire hydrants located in parking lot.
- 2 of the fire hydrants supplied directly off of fire main loop
- 6 total fire hydrants for the site
1. 9,220 SF CEP building:
- 10"x8" tee from fire main loop
- 8" DR-18 fire main leading into Fire Pump Room in CEP building finishing 1' AFF.
- 8"x6" tee to supply 1 of the fire hydrants.
- Freestanding 5" Storz FDC with 4" DR-18 line leading into building finishing 1' AFF.
2. 218,477 SF 5-story Hospital:
- 6" DR-18 fire sprinkler main exiting the Fire Pump Room.
- 6" DCDA BFP(insulated and monitored with tamper switch).
- 6" DR-18 fire sprinkler main for Hospital finishing 1' AFF.
- Freestanding 5" Storz FDC with 6" DR-18 line teeing off of the 6" fire main for the Hospital.
3. 71,903 Medical Office Building:
- 10"x8" tee from fire main loop
- 8" DR-18 fire main supplying 2 of the fire hydrants
- 8"x6" tee for 6" fire sprinkler line finishing 1' AFF
- Freestanding 5" Storz FDC with 6" DR-18 line leading into building finishing 1' AFF.
Reviewed using FFPC 8th edition effective Dec. 31, 2023. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.
Reviewer: Stuart Schnellenberger 904-209-1778, SSchnellenberger@SJCFL.US
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.