Clearance Sheet C2021-006506*003

 Department IssuesSigned OffIntl

Plan reviewed for build out of vacant unit, Type IIB construction, sprinkled business occupancy (under 50 occupants).

Reviewed using FFPC 7th edition effective Dec. 31, 2020. NFPA 1 and 101 references are Florida Editions of the code in the FFPC.

Reviewer: D. Feagle 904-209-1721, dfeagle@sjcfl.us

To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.  

**************************************

Plans approved with the following IMPORTANT information!

INSPECTOR SEE COMMENT #1

11/17/2022 dfeagle

The demising walls are rated 1 hr. Currently there is a business on one side and the other side is vacant.

11/17/2022 dfeagle

1) The interior finish schedule on ID2.1 identifies a 1/4" rubber flooring on the floor and 42" up the wall.

This material is required to meet both the floor and wall finish requirement. See requirement below.

Wednesday, June 1, 2022 1358 hrs. DF: Spoke with the Architect Angela Hayman-Kent. Angela said that the rubber flooring meets the radiant flux test of NFPA 101:10.2 but the cut sheets did not specify the class rating for the wall. Angela will provide the cut sheets with the appropriate ratings at time of the Fire Final to the Fire Inspector.

Provide the Fire Inspector with the manufacturers specification sheet(s) identifying the product meets BOTH the wall and floor finishes requirements noted below.

11/17/2022 dfeagle

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
At the time of fire final be prepared to provide a copy of the manufacturer specification sheets to the fire inspector showing that each interior finish will meet:

- Wall and ceiling finish will meet Class A, B or C. 101:38.3.3.2.2

- Floor finish shall meet either: a) ASTM D 2859 for carpet and carpet like materials or b) has a minimum critical radiant flux of .1 W/cm2 for non-carpet flooring. 101:38.3.3.3.3.

If there are multiple finishes, label each spec sheet identifying each product, its location AND highlight the area showing illustrating it meets the applicable Code requirement.

11/17/2022 dfeagle

INFORMATIONAL ONLY NO RESPONSE NECESSARY:
The system(s) outlined in this set of plans is conceptual.

A HOLD has been placed at insulation inspection (109) until either: a) a permit has been pulled or b) a letter submitted from respective system contractor indicating no work to be done to the existing system:

- Fire sprinkler system
-

-

11/17/2022 dfeagle