Plans for a 211 device fire alarm system for a large mercantile.   An overall plan is required to begin the review.  Reached out to contractor, who will overnight the information.  

---------------------------------

Overall plan provided.  Alarm is a full addressable fire alarm system for the building that will also monitor the sprinkler system and fire pump components.  The FACP is a FireLite ES200X.  Pull stations are not provided and are not required per the occupancy chapter.  See important comments below. PJW Wednesday, March 23, 2022


                                                        
Reviewed using FFPC 7th edition effective Dec. 31, 2020.
Reviewer: PJ Webb 904 209 1744 pwebb@sjcfl.us
 
To schedule fire inspections please call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.
 
For questions regarding comments you may reach me at either: 904 209 1744 or pwebb@sjcfl.us.
To schedule fire i

3/23/2022 PWebb

Important Notes:

1) There is an indication of a dry riser being located near the front entrance in the tire area.  I was not aware that there would be a riser in that location, however the sprinkler system has not been reviewed or approved as of yet.  In the event that there is no riser in that location, a revision to your plans will be necessary. 

2) A visual appliance is required in Manager 152.  I spoke with the contractor, who indicated that he will ensure that this is added.  No revision is necessary just for this.  If a revision per number 1 above is necessary later, include this in that revision.

3) Based on plan coded note 9, the contractor indicated that electronic monitoring of the backflow preventer will be provided.  This will be verified at the time of final.  As with number 2 above, if you need to submit a revision for number 1, I would like a clearer note of this added to the plans. No revision just for this is required.     

3/23/2022 PWebb