Plan submitted for revision to 37 pages (E1.01, E1.02, E1.03, E1.04, E1.05, E1.06, E2.02, E3.01, E4.01, M0.01, M0.03, M1.01, M1.02, M1.03, M1.04, M1.05, M1.06, M2.01, M2.02, M2.03, M2.04, M2.05, M2.06, P0.01, P1.01, P1.02, P1.03, P1.04, P1.05, P1.06, P2.01, P2.02, P2.03, P2.04, P3.01, P3.03, P3.05). Scope of revision: "updates showing existing conditions and general coordination". Reviewed using FFPC 7th edition effective January 1, 2021. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Reviewer: V.Vitori   
For questions regarding comments you may reach me at either: 904 209 1748 or vvitori@sjcfl.us.
To schedule fire inspections call 827 6842 (automated system).
Questions about inspections or resubmitting your plans call 209 1740x1.

Monday, March 28, 2022 This submittal is now for 55 revised pages (A0.01, A0.51, A1.01, D1.01, D1.02, A2.01, A2.02, A3.01, A3.02, A4.00, A5.00, A6.00, A7.00, A8.00, A9.00, A10.00, A11.00, A12.00, A12.01, H1.01, H1.02, H1.03, H2.00, E1.01, E1.02, E1.03, E1.04, E1.05, E2.01, E2.02, E3.01, E4.01, M0.01, M0.02, M0.03, M1.01, M1.02, M1.03, M2.01, M2.02, M2.03, M3.01, P0.01, P0.02, P1.01, P1.02, P1.03, P2.01, P2.02, P2.03, P3.01, P3.02, P3.03, P3.04, P3.05).

3/28/2022 VVitori

RESUBMITTING:
A. Make necessary changes and resubmit everything in person to the Permit Center.
B. Once at the Permit Center swap out altered pages in EACH plan set (job and office). One copy of the removed/old pages will need to be resubmitted and labeled "OLD". Do not forget to remove pages for work not associated in this permit.
C. Provide a response to comments along with any supporting documentation. 
- The response to comments sheet will need to include a response to each numbered comment and tell us where in the plans the comment was addressed. Ex - "top left of page A11" or "Page E1 note 8".
- Code responses shall reference Florida Fire Prevention Code 7th Ed. (not Building Code)

3/28/2022 VVitori

1) When looking at the newly revised page compared to the same previously approved page, they do not match let alone illustrate the changes. Example: Previously approved plan page E1.03 shows left of 2nd floor electrical. Newly submitted page E1.03 is for full building footprint of attic electrical. Complete all of the following:

- Either provide a Revision Summary identifying what changed on each page OR bubble the changes on the revised plan page.

- Only submit altered/revised pages.

- Make sure that the summary or bubbles highlight all changes since last approved plans. NOTE: Some of the mechanical pages show 3 revisions while the last is labeled ASI5.

NOTE: A review cant begin until I know what has changed since last approval.

Monday, March 28, 2022 "Drawing log" provided showing what changed on each of the 5 revisions this project has gone through. I reviewed changes called out on drawing log and bubbled items on plan pages.

3/28/2022 VVitori