Plan submitted for approx. 120' of DR-18 6" underground from 8" main stub out to 1' above finish floor. It also includes approx. 50" of 6" DR-18 underground to the free standing FDC which looks like it will tie back into the riser.  Reviewed using FFPC 7th edition effective January 1, 2021.

Reviewer: 
V.Vitori 904 209 1748

 
To schedule fire inspections call 827-6842 (automated system). Questions about inspections please call 209-1740x1.
Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

 

RESUBMITTING: Please make necessary changes and resubmit the complete permit application package. Response to comments / plans / specifications should be submitted to the Permit Center as a resubmission for the original project unless other arrangements are made with the Fire Plan Reviewer or the Fire Plan Review Supervisor.

To help speed the review process you should include a written response to comments summary to clarify and/or illustrate corrections on plans (bubbling, highlighting, or notations are best). Please use the Florida Fire Prevention Code 7th Ed. for all code reference in a response to comments. You are required to remove old pages and reinsert the new pages.

The numbered items require a response or plans to be updated to complete the review.

 

1) Submitted underground plans show 6" between FDC and system riser. Sprinkler design criteria (page FP-.02) indicate 4" is required. Either show 4" underground fdc piping OR have EOR submitted signed/sealed letter saying 6" underground between FDC and system is ok.

Florida Administrative Code (FAC) 61G15-32.002 defines a material deviation as "Any deviation from the design parameters established and documented by the Engineer of Record." Furthermore FAC 61G15-32.003(6) states "When layout documents contain material deviation from the Engineer of Record's Fire Protection System Engineering Document, such layout documents are not compliant unless they are accompanied by revised Engineering Documents made and sealed by the Engineer of record for the Fire Protection System."

Friday, January 28, 2022 C5.0 updated showing 4".

 

2) Submittals show 2 x 2.5" Siamese FDC connection. FDC connections on piping LARGER than 2 inches shall be equipped with a five (5) inch Storz connection and shall have a 30 degree downward deflection. This applies to all FDC’s regardless being on a building or free standing. 24:5.9.1.2 and 24:5.9.2.4

Friday, January 28, 2022 Submittals updated showing Storz connection.

 

3) Unknown depth of pipe bury. 24:10.4.2.2

 

4) How will any above ground piping be protected against freezing. 24:6.5.2 , 24:104.2.1.4 and 24:12.2.3