Plan submitted for  revision to 5 pages (A1.0, A1.1, M1.0, P1.0, E1.0). Scope of revision indicates "revised floor plan, revised reflected ceiling, revised mechanical and electrical sheets and new plumbing sheet". I see no bubbled changes on the provided pages nor do I see changes when comparing the approved plan set to the new pages. The "new" plumbing sheet looks just like the previously approved. Reviewed using FFPC 7th edition effective January 1, 2021. Review by the AHJ shall not relieve the applicant of the responsibility for compliance with the Code.

Reviewer: V.Vitori   
For questions regarding comments you may reach me at either: 904 209 1748 or vvitori@sjcfl.us.
To schedule fire inspections call 827 6842 (automated system).
Questions about inspections or resubmitting your plans call 209 1740x1.

NOTE: There was an FP1.1 page turned in with this set of plans for the SHELL design criteria. The shell is CO'ed. This plan page is no longer relevant. See comment below.

9/16/2022 VVitori

When the sprinkler plans come in, be prepared to provide both of the following:

a) a copy of the owners certificate completed by the owner and architect. Also it will need to be sign/sealed by the sprinkler engineer. (We do not accept electronic signatures at this time.)

b) a signed and sealed letter from the sprinkler engineer addressing if changes are needed to the existing sprinkler system. If changes are required he will need to articulate those changes. 25:4.1.6

This message was conveyed in meeting that took place 9 15 22 at 2p.

9/16/2022 VVitori